Thursday October 22, 2009 at 21:45

Storefront
work completed: we removed the entire existing facade and built up the new storefront.  Materials include douglas fir entrance area, painted black surround, and 1/2” ‘butt’ glass.
Each month the gallery hosts a new artist and along with this, one of my tasks was to design and install the window displays.

Storefront

work completed: we removed the entire existing facade and built up the new storefront.  Materials include douglas fir entrance area, painted black surround, and 1/2” ‘butt’ glass.

Each month the gallery hosts a new artist and along with this, one of my tasks was to design and install the window displays.